Tehran Metro Line 4

“Ostad Moin” Station

  • Client:
  • Location:
  • Project Status:
  • Year:
Project introduction
  • Line 4 is 23.0 km with 19 main stations. The first phase, from “Ferdowsi Square” to “Darvazeh Shemiran”, operated in April 2008. The second phase, from “Darvazeh shemiran” to “Shohada Square”, operated in February 2009. After three months the third phase, from “Ferdowsi Square” to “Enghelab Square”, was operated. On July 23, 2012 two more stations were inaugurated, connecting line 4 with line 5
  • Construction of the “Ostad Moin Station” entrance with safety protocols, considering the importance of “Azadi” as a major connecting street, and maintaining “Mehrabad Airport” underground piping system in the sidewalk
  • Construction of support, main, and side station structures including ventilation shaft and emergency exits